Open-Concept Wall Removal
All Projects

Open-Concept Wall Removal

Removed a load-bearing wall and installed an engineered beam to connect the kitchen, dining, and living rooms.

Oakdale, CA5 weeks$38,700
Scope of work

What we did.

  • Structural engineering and permit
  • Temporary shoring and wall removal
  • LVL beam and post installation
  • Ceiling, drywall, and flooring patch-in
Materials used
Beam
Engineered LVL, sized per structural calcs
Connections
Simpson post caps, bases, and hold-downs
Photo gallery

The build, start to finish.

Open sightline after beam install
Open sightline after beam install
Finished living space
Finished living space
Timeline

5 weeks, phase by phase.

  1. Weeks 1–2
    Engineering & permit

    Structural calcs and city permit.

  2. Week 3
    Shoring & demo

    Temporary support, wall removed.

  3. Week 4
    Beam install

    LVL set, posts and footings, inspection.

  4. Week 5
    Patch & finish

    Drywall, ceiling, flooring, paint.

Budget breakdown

Where the $38,700 went.

Labor34%
Shoring, demo, beam install
Structural materials24%
LVL beam, posts, hardware
Finishes22%
Drywall, ceiling, flooring patch
Engineering & permits12%
Calcs and city fees
Electrical rerouting8%
Circuits out of the wall

Percentages are approximate and specific to this project. Every estimate from Chadha Construction is itemized in writing before work begins.