Room Addition & Framing

A 420 sq ft addition adding a fourth bedroom and en-suite bath, tied into the existing roofline and HVAC.

Turlock, CA16 weeks$142,000
Scope of work

What we did.

  • Engineered plans and county permitting
  • Foundation, framing, and roof tie-in
  • HVAC extension and full electrical
  • En-suite bathroom build-out
  • Exterior stucco and paint match
Materials used
Framing
Kiln-dried Douglas fir, engineered headers
Roofing
Architectural composition shingle, color matched
Windows
Dual-pane vinyl, Title 24 compliant
Insulation
R-15 walls / R-38 attic
Photo gallery

The build, start to finish.

Framing and roof tie-in
Framing and roof tie-in
Completed exterior
Completed exterior
Finished interior space
Finished interior space
Timeline

16 weeks, phase by phase.

  1. Weeks 1–4
    Plans & engineering

    Architectural drawings and structural calcs.

  2. Weeks 5–8
    Permitting

    County plan check and permit issuance.

  3. Weeks 9–10
    Foundation

    Excavation, forms, pour, and cure.

  4. Weeks 11–13
    Framing & dry-in

    Walls, roof tie-in, windows, roofing.

  5. Weeks 14–15
    Rough-in & drywall

    Electrical, plumbing, HVAC, insulation, drywall.

  6. Week 16
    Finishes

    Paint, flooring, trim, final inspection.

Budget breakdown

Where the $142,000 went.

Framing & structure26%
Foundation, walls, roof
Labor & management22%
Crew and supervision
Mechanical/electrical/plumbing18%
HVAC extension, panel work
Finishes17%
Drywall, paint, flooring, trim
Exterior10%
Stucco, roofing, paint match
Plans & permits7%
Engineering and county fees

Percentages are approximate and specific to this project. Every estimate from Chadha Construction is itemized in writing before work begins.

The addition looks like it was always part of the house. That was the whole goal.
Homeowner, Turlock